Complete estimate. this is an estimated cost of all items, i.e. cost of main contract or material, labour and supervision, cost of land, engineering fees, miscellaneous, viz. removal costs of owner, contingency percentage, etc., which are related to the work in addition to the detailed estimate. 4.1 preparation of detailed estimates. Cost estimating the steps involved in cost estimating are; 1. materials estimates: this is the quantity take off step that was already discussed in an earlier section 2. calculate material costs: so here you just need to multiply the quantity by the cost per unit. 3. equipment estimates: to figure out this section you might have to understand. The estimator must also consider freight costs to the project site, material handling and taxes. labor and equipment costs are measured in time, hours and in days..
Cost estimating manual for projects . m 3034.03 . april 2015. engineering and regional operations . development division, design office, saeo cost estimating and cost management tools continue to be developed and will be cost, schedule, and technical changes. generally refers to the current baseline, but may. Construction cost estimating continues to evolve as design, building methods, and materials change. some trends that impact cost estimating today include: building information modeling (bim): a b uilding information model is a digital model of a structure and all its characteristics and dimensions.. A cost estimate is the approximation of the cost of a program, project, or operation.the cost estimate is the product of the cost estimating process. the cost estimate has a single total value and may have identifiable component values..
No comments:
Post a Comment